The item of the brick structure measured in sq.m, is A.  Reinforced brick work B.  Broken glass coping C.  Brick edging D.  Brick work in arches.   Answer: Option B
Read More
The minimum width of a septic tank is taken A.  70 cm B.  75 cm C.  80 cm D.  90 cm   Answer: Option B
Read More
For 12 mm thick cement plastering 1 : 6 on 100 sq.m new brick work, the quantity of cement required, is A.  0.200 m3 B.  0.247 m3 C.  0.274 m3 D.  0.295 m3   Answer: Option C
Read More
The plinth area of a building not includes A.  area of the walls at the floor level B.  area of stair cover C.  internal shaft for sanitary installations up to 2 sq m. in area D.  lift and wall including landing E.  area of cantilevered porch.   Answer:  Option E
Read More
The area of the cross-section of a road fully in banking shown in the given figure is     A. B. C. D. None of these   The answer: Option A
Read More
The expected out turn of cement concrete 1 : 2 : 4 per mason per day is        1.5 m3      2.5 m3      3.5 m3      5.0 m3 The answer: Option D
Read More
Pick up the correct statement from the following: A.         The estimated value of the work excluding the amount for contigencies, work charged establishment, tool and plants, is called work value B.      The actual expenditure involved to complete a work including incidental, establishment and travelling charges, is called actual cost C. ...
Read More
The concrete work for the following part of the building of specified thickness is measured in square meters A. Root slabs B. Floors C. D.P.C. D. Wall panels E. All the above   Answer: Option E    
Read More
Pick up the incorrect statement regarding a master trap from the following : A.       It is provided in between the lower end of the house drain and the street sewer B.       It is provided a cleaning eye at the top of the trap C.       The height of fresh air...
Read More
While preparing a detailed estimate A.  Dimension should be measured correct to 0.01 m B.  Area should be measured correct to 0.01 sqm C.  Volume should be measured correct to O.Olcum D.  All the above.   Answer: Option D
Read More