In long and short wall method of estimation, the length of long wall is the centre to centre distance between the walls and A. breadth of the wall B. half breadth of wall on each side C. one fourth breadth of wall on each side D. None of these. Answer : Option BRead More
In case of laying gullies, siphons, intercepting traps, the cost includes A. Setting and laying B. Bed concreting C. Connection to drains D. All of these. Answer : Option DRead More
Pick up the correct statement in case of water supply. A. Pipes laid in trenches and pipes fixed to walls are measured separately B. Cutting through walls and floors are included with the item C. Pipes are classified according to their sizes and quality D. In laying pipes, the method of jointing and fixing is...Read More
The brickwork is measured in sq meter, in case of A. Honeycomb brickwork B. Brick flat soling C. Half brick walls or the partition D. All the above. answer: Option DRead More
Pick up the correct statement from the following: A. The bent up bars at a support resist the negative bending moment B. The bent up bars at a support resist the sharing force C. The bending of bars near supports is generally at 45° D. All the above. Answer : DRead More
Pick up the item of work not included in the plinth area estimate A. Wall thickness B. Room area C. Verandah area D. W.C. area E. Courtyard area The answer: Option ERead More
As per Indian Standard Specifications, the peak discharge for domestic purposes per capita per minute, is taken A. 1.80 litres for 5 to 10 users B. 1.20 litres for 15 users C. 1.35 for 20 users D. All the above. Answer: Option DRead More
The order of booking dimensions is A. Length, breadth, height B. Breadth, length, height C. Height, breadth, length D. None of these. Answer: Option ARead More